Complete Gearbox & Geared Motor Solutions

Manufacturing capability

Manufacturing capability is presented as evidence: process ownership, equipment list, inspection flow and metric definitions follow management-confirmed information.

Workshop panorama

Manufacturing overview

The joint manufacturing system operates a base of approximately 8,000 m² with 26 listed core machining units (Qinchuan CNC machines, lathes, horizontal machining centers, gear hobbing and gear grinding machines), forming a project chain covering key component machining, assembly, inspection, packing, delivery and after-sales tracking.

In-house core processes

Gear, shaft and key transmission component machining, assembly and inspection capability (management-confirmed scope).

Partner supply chain

Non-in-house processes are completed by long-term supply partners under final control of the joint system.

Integrated supply products

Certain categories are integrated supply, managed by the actual production route and quality requirements.

Listed core machining equipment

The list covers 26 units across five confirmed equipment categories — not the total plant count (source: CLAIM-CF-EQUIPMENT-LISTED-TOTAL-026). Equipment photos to be added.

EquipmentQty
Qinchuan CNC machines6
Lathes4
Horizontal machining centers4
Gear hobbing machines6
Gear grinding machines6

Manufacturing and inspection process

Steps follow the actual production route; only applicable processes are listed.

  1. 01

    Incoming material inspection

    Dimension, appearance and hardness checks on raw material and parts

  2. 02

    Rough machining

    Rough turning and milling to remove stock

  3. 03

    Heat treatment

    Quenching/tempering or carburizing per process route

  4. 04

    Gear hobbing

    Gear tooth cutting

  5. 05

    Gear grinding

    Gear tooth finishing

  6. 06

    Housing machining

    Boring, milling and mounting face machining

  7. 07

    Assembly

    Cleaning, assembly and adjustment

  8. 08

    Running test

    Run-in test covering noise, temperature rise and sealing

  9. 09

    Final inspection

    100% final inspection of dimensions, running, noise, temperature and sealing

  10. 10

    Painting and packing

    Coating and export packing

Quality control

Incoming inspection → in-process inspection → final inspection: 100% of finished products undergo appearance, dimension, running, noise, temperature rise and sealing checks, with records retained.

99.57%

First-pass yield (one-time inspection pass rate)

98%+

On-time delivery rate (rolling 12 months)

26units

Listed core machining equipment

100%

Final inspection coverage before shipment

Definitions: first-pass yield is the one-time inspection pass rate (latest internal statistics); on-time delivery is a rolling 12-month statistic.

Factory gallery

Machining workshop — factory photo
Machining workshop
Machining equipment — factory photo
Machining equipment
Machining equipment — factory photo
Machining equipment
Gear machining — factory photo
Gear machining
Assembly — factory photo
Assembly
Assembly — factory photo
Assembly
Packing and shipment — factory photo
Packing and shipment
Packing and shipment — factory photo
Packing and shipment
Packing and shipment — factory photo
Packing and shipment
Finished-goods stock — factory photo
Finished-goods stock
Finished-goods stock — factory photo
Finished-goods stock
Machining workshop — factory photo
Machining workshop
Machining workshop — factory photo
Machining workshop

All figures on this page are management-confirmed (evidence level B) and reviewed before publication.