Complete Gearbox & Geared Motor Solutions

Capacidad de fabricación

Manufacturing capability is presented as evidence: process ownership, equipment list, inspection flow and metric definitions follow officially released information.

Panorámica del taller

Resumen de fabricación

El sistema conjunto de manufactura opera una base de aproximadamente 8 000 m² con 26 equipos principales declarados de mecanizado (máquinas CNC Qinchuan, tornos, centros de mecanizado horizontales, fresadoras y rectificadoras de engranajes), conformando una cadena de proyectos que cubre mecanizado de componentes clave, ensamblaje, inspección, embalaje, entrega y seguimiento posventa.

In-house core processes

Gear, shaft and key transmission component machining, assembly and inspection capability (officially released scope).

Partner supply chain

Non-in-house processes are completed by long-term supply partners under final control of the joint system.

Integrated supply products

Certain categories are integrated supply, managed by the actual production route and quality requirements.

Equipos principales de mecanizado declarados

The list covers 26 units across five confirmed equipment categories — not the total plant count. Equipment photos available on request.

EquipoCantidad
Máquinas CNC Qinchuan6
Tornos4
Centros de mecanizado horizontales4
Fresadoras de engranajes6
Rectificadoras de engranajes6

Proceso de fabricación e inspección

Los pasos siguen la ruta de producción real; solo se muestran los procesos realmente aplicables.

  1. 01

    Incoming material inspection

    Dimension, appearance and hardness checks on raw material and parts

  2. 02

    Rough machining

    Rough turning and milling to remove stock

  3. 03

    Heat treatment

    Quenching/tempering or carburizing per process route

  4. 04

    Gear hobbing

    Gear tooth cutting

  5. 05

    Gear grinding

    Gear tooth finishing

  6. 06

    Housing machining

    Boring, milling and mounting face machining

  7. 07

    Assembly

    Cleaning, assembly and adjustment

  8. 08

    Running test

    Run-in test covering noise, temperature rise and sealing

  9. 09

    Final inspection

    100% final inspection of dimensions, running, noise, temperature and sealing

  10. 10

    Painting and packing

    Coating and export packing

Control de calidad

Incoming inspection → in-process inspection → final inspection: 100% of finished products undergo appearance, dimension, running, noise, temperature rise and sealing checks, with records retained.

99.57%

Tasa de aprobación a la primera (porcentaje de aprobación en inspección única)

98%+

Tasa de entrega puntual (últimos 12 meses móviles)

26units

Equipos principales de mecanizado declarados

100%

Cobertura de inspección final antes del envío

Definitions: first-pass yield is the one-time inspection pass rate (latest internal statistics); on-time delivery is a rolling 12-month statistic.

Galería de la fábrica

Machining workshop — foto de fábrica
Machining workshop
Machining equipment — foto de fábrica
Machining equipment
Gear machining — foto de fábrica
Gear machining
RV assembly line — foto de fábrica
RV assembly line
Assembly — foto de fábrica
Assembly
Inspection — foto de fábrica
Inspection
Finished-goods stock — foto de fábrica
Finished-goods stock
Agitator stock — foto de fábrica
Agitator stock
Packing and shipment — foto de fábrica
Packing and shipment
Packing and shipment — foto de fábrica
Packing and shipment
Crate packing — foto de fábrica
Crate packing
Factory exterior — foto de fábrica
Factory exterior

All figures on this page are officially released and reviewed before publication.